Household Wind Energy

  • Client: Germany
  • Location: North Sea coast of Munich , Germany
  • Turbine Equipment: 600 MW
  • Total Capacity: 15300
  • Completed: 2014-10-24
  • Homes Powered: 2000

offshore wind farm is to be connected by a single-phase AC technology due to its proximity to the coast and because of the relatively low power of 111 MW. The 32-kilometer route will be leading from the grid connection point, four kilometres through the coast by land and another 28 kilometres under water to the wind farm., Tennet filed extensive application forms for both the sea and the land route of the grid connection project to the authority of Lower Saxony State of Germany, which is in demand of both roads and transportation.